| To: |
|
Date: |
|
| Attn: |
|
Validity: |
|
|
|
Ref: |
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| Project: |
|
| Subject: |
|
| 1. Currency: |
In United Arab Emirates Dirhams |
| 2. Scope: |
|
| 3. Delivery Time: |
|
| 4. Payment: |
|
| 5. VAT: |
Will be charged extra as applicable as per UAE Law. |
We hope that you will find the proposal in line with your requirement.
Should you need any more information or clarification please feel free to contact us.
We are glad to be associated with your esteemed organization and look forward to working with
you.
Kindly endorse and return to us this quotation to confirm your acceptance of the attached
offer.
Key Account Manager
Signature:
|
|
Accepted and confirmed by,
Client Name:
Position:
Signature:
|
    
Introduction
Our seeds were planted over ten years ago back in 2006; through hard work, sacrifice and
dedication,
our team of Integrated Lighting Solutions Specialists, Close-knit Creatives, Strategists, and
Global
Leading Partners; Triangle Power Solutions was put on the map and remained there as a leader in
providing unforeseen lighting experiences, seamlessly integrating the highest levels of
creativity
and technology of the modern world.
Our work is recognized for its personality and deep attention to detail; known by our clients as
a
committed partner who delivers on time, every time, on budget and above all, always exceeding
expectations with our creative innovation. We are always committed to the excellence of our work
and
to the quality of the long-lasting relationships we build.
    
Services and
Products
1) Indoor Architectural Lighting
2) Decorative Lighting
3) Landscape and Outdoor Lighting
4) Street and Infrastructure Lighting
5) Façade and Media Façade Lighting
6) Lighting Control and Emergency Lighting Systems
7) Home Automation and Smart Home Systems integration
8) Lighting Design for Residential and Retails
    
Bill Of Materials
    
Summary
| Summary |
Line Item |
Description |
Price |
| The price quoted is exclusive of VAT and will be charged extra as
per
UAE Law |
    
Scope & Design
Consideration:
    
Terms & Conditions:
The given price is applicable for offered quantities. Changes in quantities and elimination of
items
are subject to recalculation of our offer.
The given price presented above includes supply, supervision installation, Testing and
commissioning.
Customs duties and sales tax are calculated based on current regulations provided by the local
customs authorities at the time of order confirmation. If any changes are announced and
implemented
by the authorities between the time of order confirmation and delivery, then these changes shall
be
applied on the final invoice
Our offer only includes the items mentioned in the description. Any accessories or components
not
listed are not included.
Installation is not included in the scope and therefore is not included in our prices unless
stated
otherwise.
An order shall not be processed till the payment terms of the offer are fulfilled and the
advance
payment has reached our bank, or the Letter of Credit is established.
The indicated delivery time starts the dates of the payment terms are fulfilled or from receipt
of
the advance payment and/or Letter of Credit in our bank.
No retention is applicable unless stated otherwise.
In case an order is cancelled after it is confirmed, the down payment shall not be refunded, and
the
order is subject to the cancellation fee.
The installation of goods should be according to the guidelines of the manufacturer or
installation
manual normally supplied with the goods. Failing that shall void the warranty
Once the delivery notes signed by the customer, it is no longer the responsibility of TPS (or
associated legal entities), thus they cannot be returned nor refunded.
If the customer decides not to receive the materials as per the delivery schedule due to any
site
conditions, the balance payment due date should start from the date we notify the customer about
the
readiness of the materials.
    
Exclusions:
Wire pulling, conduits, trunks, LAN Network etc.
Building network is out of our scope and to be provided by IT contractor
Any equipment not listed in our “Bill of materials”.
Any Kind of Civil, masonry, carpentry works, such as breaking and making good patching and
Painting.
Furniture Mobilization
Shop Drawings
PC Server (since it was included in the first package that was supplied and commissioned)
Conventional / Push button
Any power / Control cables